Visitor Counter

0128622
Visit Today : 60
Visit Yesterday : 102
This Month : 1152
This Year : 1152
Total Visit : 128622
Hits Today : 236
Total Hits : 425272
Who's Online : 1
Your IP Address: 54.82.29.141
Server Time: 18-01-18
plugins by Bali Web Design

Lemoore charged up over charging stations

November 8,2107-

Screen Shot 2017-11-08 at 2.30.02 PMChargePoint company says they are helping more people choose to drive electric. The company was recently awarded a California Energy Commission grant to develop, own, and operate high-speed EV charging stations along key highway corridors in California.
Now they want to install a station in Lemoore the city council heard at a study session last month. Staff says an agreement with the company its expected in coming weeks.

Within the next 2-5 years the amount of EV drivers in the community will increase rapidly believes Bothe the company and the state. At no cost to the City of Lemoore, Charge Point plans to install and maintain 10 total parking spaces with the initial installation of 2-4 high-speed EV chargers and 1 dual port Level 2 charger. It serves drivers wanting to make a 30min – 1 hr stop; compatible with all electric vehicles. Level2 charging ports charge time is between 1 – 3 hours.
The development is expected to make Lemoore a popular stop along Hwy 41 and increase visitation to Downtown Lemoore. ChargePoint would own, operate, and maintain the stations at their own expense over a 15 year term (option to auto renew).

The station may be located at the city parking lot on E Street near the depot.

Leave a Reply

Your email address will not be published. Required fields are marked *